Power networks/Morocco


Country Information
Morocco (MA)
Morocco flag

References
OpenStreetMaprelation 3630439
WikidataQ1028
WikipédiaMorocco
Country characteristics
ContinentAfrica
Population36,828,330
Area446,550 km2
GDP134.2 B$
Language(s)Arabic, Standard Moroccan Amazigh
Electrical Network
Generation capacity11,060 MW (OSM)
Power line length37,102 km (OSM)
Frequency... Hz
Transmission lines voltages (kV)...
Data from Wikidata (last update 2025-05-17)
and OpenInfraMap (last update 2025-07-22)

This page has been created through the power networks country page template. Check the template page for more information on how to complete it.

High-voltage Electrical Network

State of the map

In 2025-04:

Network description

Voltages and frequency

Frequency : TODO Hz

Network Voltage Comments Appearance
Transmission TODO


Operators

Operator Network Wikidata Website Wikipedia Operating area Information Label Taginfo
TODO Transmission Q99999
WhatLinksHere
TODO TODO operator=TODO
operator:wikidata=Q99999
operator=TODO

Interconnections

Neighbour country Structure name Year of commissioning Technology Voltage Local end Foreign end OSM circuit Notes
TODO xxx

Planned projects

  • ...

Data Sources

Source License Date Suitable for OSM Notes
xxx ? no -


Network statistics

Morocco has 106 power plants totalling 11,060 MW and 37,102 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-07-22)

Power line

Power Lines Voltage Length
From OpenInfraMap, last update 2025-07-22
< 10 kV 2 km
10 kV - 25 kV 9,192 km
25 kV - 52 kV 1 km
52 kV - 132 kV 10,684 km
132 kV - 220 kV 102 km
220 kV - 330 kV 8,811 km
330 kV - 550 kV 1,993 km
> 550 kV 0 km
No voltage tagged 6,314 km
Total 37,102 km

Electricity generation

Mapping process and community

Mapping success stories

Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.

  • Mwiche [2025-04]: Added several substations around the country, using satellite images.
  • Mwiche [2025-04]: I was able to extend lines and connect them to the grid.

Encountered problems and places to improve

  • Mwiche [2025-04]: The satellite images were of varying qualities for different regions, so I had to combine all sources available.
  • Mwiche [2025-04]: Many urban towers are still missing and lines could not be connected to substation in urban areas.
  • Mwiche [2025-04]: The grid still has some line splits and routing issues that still needs to be fixed.
  • Mwiche [2025-04]: For some lines voltages are still missing.
  • Mwiche [2025-04]: A lot of substations are missing meta data information
  • Mwiche [2025-04]: There are errors in the past mapping that could be resolved.

Use of mapping strategies

Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.

  • Search for "Unfinished major power lines" - last time applied by Mwiche [2025-04]
  • Searching for power plant connection - last time applied by Mwiche [2025-04]
  • Searching for substation connection - last time applied by Mwiche [2025-04]
  • Searching for parallel lines - last time applied by Mwiche [2025-04]
  • Identifying obvious gaps in the network topology from a national perspective - last time applied by Mwiche [2025-04]
  • Identifying new substations and transmission lines - last time applied by Mwiche [2025-04]

References